整专业资料
微信QQ群
考生网QQ群

群号:517231281

扫码加群
点击二维码加群

考生网微信公众号

微信号:zikaosw

课程试听
最新资讯

手机端访问

1、直接输入www.zikaosw.cn
2、扫描左侧二维码

登录 | 注册
登录/注册后,可享受
  • 课程免费试听
  • 试做在线题库
  • 学习提升指导
  • [阅读理解]

    【题干】请根据短文内容判断给出的语句是否正确,正确的写"T",错误的写“F'
    The road system in Beiing' s central business district (CBD) is being re-designed to ma ke public transportation easy and improve ef ficiency.
    Plans for 45 roads within the CBD have been approved, measuring 41. 5 kilometers in total, In addition to public buses, free or low price shuttle buses from residence areas to
    subway stations will also be provided for commuters.
    This is just over four times the number of roads opened in 2007, and will add anot her 15.5 km to the existing road network,
    Besides roads, an underground traffic system has also been operating, w hich includes four new subway lines beneath the CBD.
    The underground connection system is made up of two levels. The first underground floor is set aside mainly for pedestrians and commercial facilities, while the second underground floor is planned for par king.
    The city has also invested 140 million yuan to set up a traffic inquiry system, throughwhich the public can check traffic conditions online and see the most convenient routes on their GPS system. In the future, the CBD will be fully covered by an intelligent trafficcontrol system.

    【题目】The re-designed road will be 15. 5 kilnmeters long.

     纠错    

  • 助考班推荐

您可能感兴趣的试题

Copyright © 2010 - 2023 湖南求实创新教育科技有限公司 All Right Reserved.

温馨提示:如您需要的资料本网暂时没有,请于工作日08:00-18:00,点击这里,联系客服及时补充资料。